From: Revisiting Design Criteria for Stormwater Treatment Systems, Part 3
Table One
| Table 1. Comparison of Design Criteria for Flow-Through Swales and Strips |
| Design Parameter |
Washington |
California |
Texas |
Virginia |
Georgia |
Denver |
| Performance Goal |
80% TSSb |
|
|
Based on TPc |
80% TSSa |
|
| Volume Goal (%) |
91 |
80 |
|
|
85 |
80d |
| SWALES |
| Manning's n |
0.20 to 0.30 |
0.25 |
0.20 |
0.15 |
0.15 |
0.05 |
| Residence time at design flow (min) |
9e |
10 |
|
|
5 |
|
| Water depth at design flow (in) |
2 if mowed,
4 if not |
4 |
6 |
|
4 |
24 |
| Grass height (in) |
|
6 |
|
|
4 |
|
| Min. longitudinal slope (%) |
1.5 |
|
|
0.75 |
|
0.2 |
| Max. longitudinal slope (%) |
2.5 |
2.5 |
5 |
5 |
|
1 |
| Max. velocity (fps) |
1 |
|
1 |
1.5 |
|
1.5 |
| Min. length (ft) |
100 |
100 |
|
|
|
|
| Max. width (ft) |
10 |
10 |
|
|
6 |
|
| STRIPS |
| Manning's n |
0.35 |
|
0.20 |
|
0.15 to 0.35 |
|
| Max. width of paved area treated (ft) |
150 |
60 |
|
|
150 |
0.05 cfs/lin. ft |
| Max. longitudinal slope (%) |
5 |
15 |
5 |
2 |
6 |
4 |
| Max. water depth (in) |
1 |
|
6 |
|
|
1 |
| Detention time at peak flow (min) |
9e |
|
|
|
5 |
|
| Minimum length (ft) |
|
15 |
10 |
25 |
15 |
|
a. Goal is for other BMPs: does not consider swales and strips capable of achieving the goal.
b. An effluent concentration of 20 mg/L at influent concentration less than 100 mg/L
c. No specific goal is established. Removal expectations are provided for each type of system, ranging from 10% to 65%.
d. The volume of 80% of the events is fully treated.
e. If placed above a flood control detention facility or if such a facility is not required. |
March-April 2005
From: Revisiting Design Criteria for Stormwater Treatment Systems, Part 3
Table One
| Table 1. Comparison of Design Criteria for Flow-Through Swales and Strips |
| Design Parameter |
Washington |
California |
Texas |
Virginia |
Georgia |
Denver |
| Performance Goal |
80% TSSb |
|
|
Based on TPc |
80% TSSa |
|
| Volume Goal (%) |
91 |
80 |
|
|
85 |
80d |
| SWALES |
| Manning's n |
0.20 to 0.30 |
0.25 |
0.20 |
0.15 |
0.15 |
0.05 |
| Residence time at design flow (min) |
9e |
10 |
|
|
5 |
|
| Water depth at design flow (in) |
2 if mowed,
4 if not |
4 |
6 |
|
4 |
24 |
| Grass height (in) |
|
6 |
|
|
4 |
|
| Min. longitudinal slope (%) |
1.5 |
|
|
0.75 |
|
0.2 |
| Max. longitudinal slope (%) |
2.5 |
2.5 |
5 |
5 |
|
1 |
| Max. velocity (fps) |
1 |
|
1 |
1.5 |
|
1.5 |
| Min. length (ft) |
100 |
100 |
|
|
|
|
| Max. width (ft) |
10 |
10 |
|
|
6 |
|
| STRIPS |
| Manning's n |
0.35 |
|
0.20 |
|
0.15 to 0.35 |
|
| Max. width of paved area treated (ft) |
150 |
60 |
|
|
150 |
0.05 cfs/lin. ft |
| Max. longitudinal slope (%) |
5 |
15 |
5 |
2 |
6 |
4 |
| Max. water depth (in) |
1 |
|
6 |
|
|
1 |
| Detention time at peak flow (min) |
9e |
|
|
|
5 |
|
| Minimum length (ft) |
|
15 |
10 |
25 |
15 |
|
a. Goal is for other BMPs: does not consider swales and strips capable of achieving the goal.
b. An effluent concentration of 20 mg/L at influent concentration less than 100 mg/L
c. No specific goal is established. Removal expectations are provided for each type of system, ranging from 10% to 65%.
d. The volume of 80% of the events is fully treated.
e. If placed above a flood control detention facility or if such a facility is not required. |