The city of Santa Monica’s new policies were clear: Significant best management practices (BMPs) must be in place to protect all 13 of the sub-watersheds in its boundaries from pollution. That meant some serious planning for Neal Shapiro, urban runoff management coordinator for the California city.

The treatment of stormwater is especially important at the city’s Centinela sub-watershed. Stormwater runoff from this site runs into the Sawtelle Channel, a large storm drain conduit that runs next to Los Angeles’ Mar Vista Park, a public park that is part of the Centinela shed. From there, the stormwater runoff eventually flows to Ballona Creek, a nearly 9-mile waterway that eventually drains into the Santa Monica Bay.

Runoff that escapes the Centinela sub-watershed untreated, then, would eventually end up in the bay, a situation no one wants.

Shapiro, though, faced a set of unique challenges largely because of the sub-watershed’s urban location. He had to deal not only with commissioners and regulators in his own city, but also with those in bordering Los Angeles, because the Centinela sub-watershed treats both dry-weather and wet-weather runoff from the western portions of that city, as well as from Santa Monica itself.

Shapiro and Santa Monica officials decided, in the plans for their Westside Water Quality Improvement Project, to treat the runoff with a two-stage system consisting of a concrete StormFilter, 300 feet of underground diversion pipeline, and a baffle box. But, again, the treatment system’s urban location presented challenges. Because the work would be taking place in a public park, Shapiro had to work closely with park district officials. He also had to schedule some work to coincide with another job at Mar Vista Park, the installation of synthetic turf in an existing field.

“Because of the location of the project, we did have to take several additional steps. The location made scheduling more of a challenge,” Shapiro says. “The city already had a parks project going on. We had to get our project going quicker than we had originally anticipated so that we could get that diversion pipeline in. It required some real hustling to get that one done in time.”

Shapiro is hardly alone in facing challenges that are a direct result of a stormwater treatment project’s urban location. Working on projects in crowded areas requires creative solutions, flexible work schedules, and the ability to quickly change plans.

Stormwater engineers and contractors will have to face these challenges more frequently. The stormwater infrastructure is aging quickly in municipalities across the country. In some cases, stormwater treatment systems were built long before federal and state water-quality regulations became more stringent. In both cases, construction crews and engineers must retrofit these existing systems, whether they require complete rebuilding or more minor tweaks.

Photo: Romtec Utilities
At this Chicago-area underpass, water from the roadway drains to underground vaults and is then pumped to the stormwater sewer.
And doing so will require construction crews to operate in spaces that are often cramped, while diverting heavy vehicular traffic. Engineers need to draft creative plans for getting this urban retrofitting work done, while disrupting as little as possible the lives of commuters and city residents.

It’s a difficult job, but also one that will be keeping stormwater pros busy for a long time.

“I think we’re going to see an even greater need for these urban retrofitting projects,” says Jim Lenhart, chief technology officer with Contech Stormwater Solutions in Scarborough, ME. “The NPDES [National Pollutant Discharge Elimination System] regulations have definitely had an impact. For a lot of municipalities to meet their permit requirements, they have to go back into existing infrastructure and retrofit.”

There is no reason to have stormwater treatment systems if they do not do the job either because of aging or because they weren’t installed properly in the first place, he says.

“If we stop all development today, that’s not going to stop the problem,” Lenhart says. “We are going to have to go back and retrofit the systems that aren’t doing a good enough job anyway. Somebody once told me that just because we are requiring effective treatment systems for all new construction, that doesn’t mean we are making the problem go away. We are just slowing it down.”

It’s not only aging infrastructure and tougher permit requirements that are causing an increase in the number of urban retrofitting projects. As urban areas grow in population, they need a greater number of homes and businesses. This increases the amount of impervious surfaces in a community.

In a sort of chain reaction, the greater amount of parking lots and other paved surfaces means that municipalities must install larger pipes and more efficient treatment systems to handle the increased and quicker-flowing runoff.

Photo: Romtec Utilities
The Franklin Park, IL, Grand Avenue pump station
Meeting a Need
The stormwater professionals interviewed for this story agreed that it’s a positive trend, and healthy for residents and the environment that municipalities are putting an increased emphasis on treating runoff in urban areas.

Manufacturers and municipal officials also agreed that this segment of the industry will continue to grow as federal treatment regulations grow ever stricter.

“The underlying mantra of ‘treat it all’ is driving the development of stormwater treatment in urban areas,” says Mark Sheldon of Romtec Utilities in Roseberg, OR. Sheldon’s company makes submersible pumps that are often used in tight-fitting urban projects.

“The requirement to handle stormwater and to pump stormwater has always been there,” he says. “But there was a time when a tremendous amount of stormwater was allowed to just run off into creeks or the lake or into the ocean. That is no longer the case. Now, whenever you are building something new, or whenever you are working on a retrofit project, you have to treat all the stormwater runoff before letting it discharge into another body of water. This is a good thing, and it is making retrofit a more important part of the stormwater treatment business.”

For evidence of the growing importance of urban stormwater work to the industry, Sheldon needs only to look at his own company. Romtec has three main markets for its submersible pumps: wastewater, industrial, and stormwater.

Five years ago, the stormwater portion of Romtec’s business was about a quarter as large as was the company’s industrial sector, Sheldon says. Today, Romtec’s pump sales for stormwater uses are nearly as large as they are for industrial work.

“Whether it be rerouting stormwater to traditional wastewater treatment plants, or whether it be the onsite treatment of potentially polluted stormwater, we are now seeing it mandated in one form or another that all runoff must be treated,” he says. “The requirements to treat stormwater—in urban areas, too—grows greater and greater, and reaches all of us. Water is our precious resource.”

While the increase in business is undoubtedly positive for stormwater professionals, urban retrofit projects are not always easy tasks. Treating stormwater runoff and installing BMPs that are effective can prove challenging when projects are tackled in crowded urban areas where space is often limited.

And working in urban areas often means dealing with a host of regulatory bodies, as Shapiro from Santa Monica discovered during his city’s work with the Westside Water Quality Improvement Project.

Working in crowded urban areas also means that construction crews must work around utilities. This, too, can pose conflicts. And resolving them often means that municipalities and property owners must spend a significant amount of money.

“Obviously, when you’re dealing with tight spaces, the work has to be a bit more surgical,” says Lenhart. “We also find that costs typically are higher with a retrofit than with a new project. Normally, the installed costs of these systems are a lot less than when you are retrofitting an existing system. For any technology, for the dollars spent per gallons-per-minute treated, they tend to be more expensive than new construction costs.”

Treating Runoff in Santa Monica
Shapiro’s work with the city of Santa Monica’s Westside Water Quality Improvement Project in the Centinela sub-watershed began in November 2004. That’s when construction crews first began installing 300 feet of diversion pipeline under an athletic field at Mar Vista Park.

Construction crews tackled this work earlier than expected to take advantage of a turf-replacement job already taking place at the athletic field. This meant, of course, that installers had to work quickly.

But that was just one wrinkle to the project.

The Mar Vista Park location provided the ideal location for treating both dry- and wet-weather runoff. Unfortunately, the runoff from the site—which goes into the Sawtelle Channel, into nearby Ballona Creek, and finally into the Santa Monica Bay—runs not only through Santa Monica, but through portions of West Los Angeles, too.

This meant that engineers had to earn permits and approvals from several regulatory bodies before construction work could begin.

Fortunately, the city did gain all the permits it needed. Engineers then designed a two-stage system to treat the runoff. First, plans called for a Stormwater Management StormFilter designed by Contech. This product filters a full range of pollutants commonly found in urban runoff, including soluble heavy metals, oil, grease, and nutrients.

The filter basically resembles a large concrete barrel with individual cartridges. Each cartridge contains different filtering materials to remove different types of pollutants. This product treats the dry-weather flow.

The system’s second level of protection comes from Bio Clean Environmental Services’ Nutrient Separating Baffle Box, which catches the solids, floatables, sediment, and debris from wet-weather flows. Both the Baffle Box and the StormFilter capture oils and grease.

The new treatment system began working in the fall of 2006. Since then, it’s handled the heaviest runoffs without any problems, Shapiro says.

“It’s working very well,” he says. “Everything is underground. The treatment system is under one of the parking lots, so no one even knows it is there. I think it was a win-win project. We’re treating runoff from both Santa Monica and from West Los Angeles. I think that’s a
good deal.”

Easing Traffic Problems in Illinois
The problem was simple: Grand Avenue had become too crowded. Finding a solution wasn’t so simple. Municipal planners with the Chicago suburb of Frankfort, IL, had worked for decades to devise a solution to eliminate the congestion.

This section of Grand Avenue serves as a main east-west route from the busy O’Hare International Airport and Chicago. Unfortunately, rail lines—including the only north-south route of the Canadian Pacific Railway—intersect this stretch of Grand Avenue in several places. With dozens of trains crossing Grand Avenue each day, the road often resembled a parking lot filled with idling cars. In one area, two sets of railroad tracks cross Grand Avenue only a thousand feet apart. This created serious safety issues whenever traffic backed up between the two rail crossings.

In 2001, the village finally tackled the congestion problem at Grand Avenue, commissioning the construction of a below-grade underpass for the road. Three rail lines now pass over the street on a steel bridge, boosting safety and eliminating long delays.

The underpass, though, did present some problems of its own. It created a low area in the road. Engineers had to devise some way to prevent stormwater from collecting in this space. Municipal engineers say that a full half-mile of road drains into the low-lying area underneath the new bridge.

Creating a stormwater treatment and collection system required the usual challenges of working in urban areas: tight working conditions and the need to disrupt as little of roadway traffic as possible.

“Working in that tight space was one of the biggest challenges we faced on that project,” says Frank Noonan, senior associate with CTE, an engineering firm based in Chicago. “Also, Grand Avenue had a multitude of existing utilities that had be worked around or relocated. We had to deal with that while working around existing traffic, and trying to interrupt traffic as little as we could.”

Construction crews built a storm drain consisting of three rows of 6-foot by 12-foot box culverts, totaling 330 feet in all, to collect stormwater. This runoff flows through an underground drainpipe into the 6-foot wet well of a Romtec Utilities-created lift station that sits alongside Grand Avenue.

From inside the wet well, a pair of 10-horsepower submersible pumps built by ITT Flygt—a manufacturer of pumps—lift the stormwater to Franklin Park’s combined sewer system. This system features partially separated channels for sanitary sewage and stormwater runoff.

The lift station, which has performed well during all the storms that have hit the Chicago area since its installation, has an onsite generator with an automatic transfer switch that guarantees an uninterrupted power supply even in the case of electrical outages.

For Noonan, working within the confined space of an urban setting was far from unusual. He tackles numerous projects in Chicago and its suburban communities where cramped quarters, busy highway traffic, and existing utilities are common.

“We do a lot of work trying to integrate new systems with stormwater systems that already exist,” Noonan says. “You almost never are working on a fresh start. So you are always worried about the impact that you might have on an existing system. There are so many unknowns. It’s like working on an old house. When you pressurize those old pipes, you may end up springing a few leaks.”

Reconstructing Doremus
Traffic congestion was the impetus for another urban stormwater project that required work in cramped locations, this one in New Jersey in the winter of 2004.

The New Jersey Department of Transportation commissioned work to widen the lanes and shoulders of Doremus Avenue, the main street serving the dock areas of Port Newark. The job also required construction crews to install about 9,500 feet of new storm sewer lines that would discharge safely into the Passaic River.

One challenge was to keep pollutants in the surrounding soil from entering the system. The water and sediment of the Lower Passaic River watershed are contaminated with dioxin, PCBs, DDT, heavy metals, and hydrocarbons, all of which remain in the soil. It’s little surprise that such pollution exists: Doremus Avenue is now flanked by nearly 400 large industrial plants, including those specializing in electroplating, metal finishing, pharmaceutical manufacturing, and refinery operations. The trucks that use the road daily also bring their own residual oil and gas pollution to the area.

It was essential, then, to make sure that these harmful chemicals and pollutants did not escape into the river or into the new storm sewer lines. The area, with its high concentration of pollutants, has become an area of concern for the New Jersey Department of Environmental Protection and the New Jersey Department of Transportation. It was up to the engineers with design consultant Louis Berger Associates of East Orange, NJ, to come up with a stormwater system that would keep the chemicals and other pollutants out of the Lower Passaic River.

The engineers eventually decided to install corrugated polyethylene pipe from Advanced Drainage Systems (ADS), a manufacturer of pipes, drain basins, and chambers. Hong Sun, project manager with Louis Berger Associates, says the drainpipe on this project could not be vulnerable to anything that was in the soil. The engineers also required a pipe that could be manufactured in custom lengths and had as few joints as possible.

“The only way we could prevent polluted groundwater from getting into the new storm drain system was to use pipe that could give us the flow characteristics, stand up to the harsh environment, and have a gasket that would securely seal the pipe joints,” Sun says. “We knew from the very beginning concrete pipe wouldn’t work. It wouldn’t be able to give us the seal or stand up to the environment.”

The pipe connections and seals also had to withstand heavy loads, including a significant amount of truck traffic loaded with shipping containers from the port.

Even with careful planning, surprises popped up. Construction crews, as often happens in urban areas, discovered underground utilities and structures that were never identified on the original plans. This is not too surprising; construction crews over the years had built, rebuilt, dug up, and changed the Doremus Avenue area significantly. The area, in fact, has been in a constant state of growth and change for more than 100 years, leaving an uncharted twist of pipelines, gas lines, water mains, and sanitary sewer mains. High-voltage electrical feeds carrying power for the New Jersey Transit and Amtrak also ran under the construction area.

To make the construction process run smoothly, construction crews provided ADS with measurements for different pipe lengths throughout the project. ADS then custom made what was needed to complete the different phases of construction. In all, ADS supplied 206 custom-made lengths of pipe ranging from 15 to 60 inches in diameter.

Construction crews also had to deal with the traffic that routinely travels Doremus Avenue, a major truck route. Crews could not shut down or detour this traffic.

To solve this problem, crews completed the job in two phases. First, crews built the sewer inlets and cross pipes on the upstream side of the road. They built these cross pipes to the centerline of the road.

In the second phase, crews installed the trunk line down the middle of the road’s northbound lane and connected the cross pipes to the trunk line. This part of the job required the nonstandard lengths of pipe that ADS had to manufacture. Crews used nitrile gaskets to seal each pipe joint. The high concentration of petroleum-based contaminants in the soil could have harmed standard polyisoprene rubber gaskets.

Jim Goddard, chief engineer for ADS, says the challenges construction crews encountered on the Doremus Avenue project are not uncommon on urban retrofit projects.

“You never know what is in the ground before you start digging,” Goddard says. “The bigger cities, the older cities, there are things under the ground that no one even knows what they are anymore. Ever seem them open a hole in Manhattan? It’s shocking. There’s a spaghetti of stuff down there. Who knows what it all is?”

Like other engineers, Goddard, too, says stormwater pros need to get comfortable working in cramped, urban areas. The industry will only see more of these projects in the future.

“We are seeing more efforts to move people back into cities, away from suburban sprawl,” Goddard says. “That is going to change the construction environment within the city in a significant way. This is an issue that is coming into play in the near term. This is not happening 10 years down the road. This is happening fairly quickly.”

Author's Bio: Dan Rafter is a technical writer based in Illinois.

What Do You Think?

Post a Comment

Be the first to tell us what you think!

Post a Comment

Not a subscriber? Sign Up
 
 
*  
 




 

Get Stormwater E-mail Updates!

Get weekly news and updates through our Stormwater e-mail newsletter!